XF-N5LL2S9-4 Second Party Opinion ACTIVE
verbund - 3. Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). Duration: 2011 – 2015 Total project costs: €93.5M
Verification
XFIDs are content-addressed: these SHA-256 fingerprints let anyone confirm a copy of this document is identical to what XFID retrieved on 20 March 2026 — independent of this registry.
The canonical-content hash survives re-downloads, URL moves, and byte-level re-encodes: the same disclosure text always resolves to this XFID.
Assessment Provider
Related Documents
Version History
| Retrieved | Action | Size | |
|---|---|---|---|
| 20/03/2026 | INITIAL | 1004 KB | latest |
How to Cite This Record
Use the XFID in citations to create a stable, permanent reference that resolves to this registry entry regardless of the source URL.
Academic / report citation
Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). (2014). verbund - 3. Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). Duration: 2011 – 2015 Total project costs: €93.5M. XFID: XF-N5LL2S9-4. Retrieved from https://xframework.id/XFN5LL2S94
Identifier only
XF-N5LL2S9-4