XF-N5LL2S9-4
Second Party Opinion ACTIVE

verbund - 3. Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). Duration: 2011 – 2015 Total project costs: €93.5M

Document Metadata

Issuer
Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II).
Document Type
Second Party Opinion
Publication Year
2014
Retrieved
20 March 2026
Source
Contact XFID for Access
Record ID
XFN5LL2S94
Validation
Inferred by XFID

Verification

XFIDs are content-addressed: these SHA-256 fingerprints let anyone confirm a copy of this document is identical to what XFID retrieved on 20 March 2026 — independent of this registry.

SHA-256 (file bytes)
771b1eaab9e58df067c4accef39e5c3e9bed3a841d5731a5c0c0ae94527657ec
SHA-256 (canonical content)
8b1ddd9985cfaf1fccf26e7ca365199e50d96859049a1839bceaa8116203efc0
File
1004 KB

The canonical-content hash survives re-downloads, URL moves, and byte-level re-encodes: the same disclosure text always resolves to this XFID.

Assessment Provider

Version History

Retrieved Action Size
20/03/2026 INITIAL 1004 KB latest

How to Cite This Record

Use the XFID in citations to create a stable, permanent reference that resolves to this registry entry regardless of the source URL.

Academic / report citation
Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). (2014). verbund - 3. Construction of three wind power plants in Lower Austria (Hollern II, Petronell II, Bruck-Göttlesbrunn II). Duration: 2011 – 2015 Total project costs: €93.5M. XFID: XF-N5LL2S9-4. Retrieved from https://xframework.id/XFN5LL2S94
Identifier only
XF-N5LL2S9-4